Friday, October 16, 2009

bloomingdale Subdivision

Socialized Housing w/c is High-end Concept
May 28, '08 8:42 AMfor everyone
BLOOMINGDALE SUBDIVISION is using the CAST-IN-PLACE WALL SYSTEM “a US technology” in building construction . This is a method where the entire wall of a building is shaped with steel forms; these steel forms are aligned, anchored and braced to ensure its stability. Reinforcement, plumbing and electrical preparations are installed and imbedded within, before fresh concrete is poured. The result is a solid concrete wall with much higher strength than the conventional hollow block, and with accurate alignment of wallsBLOOMINGDALE SUBDIVISION Phase I and II , cover a land area of 141,347 square meters. Construction of units started in the 2nd quarter of 2007 and end in the last quarter of 2008.BlOOMINGDALE SUBDIVISION Phase III , covers a land area of 136,746 square meters with 826 units. Construction starts 1st quarter of 2009.


Features and highlights:
Features and highlights:* Perimeter fence* Landscape entrance gate* Guardhouse* Landscape parks and playground* Children play amenities* Basketball court* Underground drainage system* Concrete road with sidewalk* Concrete curbs and gutter* Street lightings* Water supplied by COWD* Electric powered by Cepalco.

No comments:

Post a Comment